Skip to content

CDO & Digital Office - 30/60/90 Day Plan

Prepared by: Daniel O'Reilly, Chief Digital Officer
Prepared for: Yassir Pasha, Chief Executive Officer / Executive Leadership Team
Date: 7 April 2026
Classification: Confidential - ELT Only
Version: 2.0 (supersedes CDO 90-Day Plan v1.0, dated 3 April 2026)


How to Read This Document

This plan has two parts:

  1. Part A: CDO 30/60/90 - the CDO's personal accountability across the entire division (Solution Engineering, Platform Engineering, Data Engineering, Production Engineering, Information Security, Product Management, Digital Office). Updated to reflect Week 1 progress.

  2. Part B: Digital Office 30/60/90 - the dedicated plan for the new Digital Office team, the CDO's strategic execution arm.

Each initiative includes: priority (P1–P4), owner, deadline, key results, pros/cons, estimated cost/value, and a status tracker.

Priority definitions: - P1 - Regulatory/Licence Critical: Delays the DFSA Cat 3D licence or creates regulatory risk - P2 - Revenue/Expansion Critical: Blocks Saudi Arabia entry or corridor revenue - P3 - Operational Excellence: Improves reliability, security, or efficiency - P4 - Strategic Foundation: Builds long-term capability


Part A: CDO 30/60/90 Day Plan

Progress Update - Week 1 (Days 1–8)

Initiative Status Notes
1.1 Operating Model v1.0 Substantially complete 17 sections written (1.1 MB). Pushed to Bitbucket (simpaisa1/opmodel). Board presentation pending.
CDO Division Org Chart v4.0 complete 7 tribes defined. 63 placed, 13 hires, 1 pool, 1 resigned. Target: 70.
Ways of Work Framework 14 documents drafted W-01 through W-50 published to Confluence. Operating rhythms, engineering, security, data, product, ops, compliance, HR.
Confluence Architecture Space Created Standards, regulatory playbooks, threat models, workflow diagrams all published.
Regulatory Playbooks 5 markets drafted Pakistan, Bangladesh, Nepal, UAE, Saudi Arabia, Egypt.
Threat Models 3 completed Pay-Outs, Merchant Portal, Remittances.

Assessment: Week 1 output is exceptional. The documentation foundation is built. The risk is now execution - moving from documents to delivered change.


Phase 1: Assess and Document (Days 1–30)

Period: 30 March – 29 April 2026

1.1 Operating Model Completion ✅ IN PROGRESS

Field Value
Priority P1
Owner CDO
Deadline 9 April (finalisation) / 29 April (board presentation)
Status 80% complete - content written, board deck pending

Key Results: - [x] All 17 sections drafted and version-controlled - [x] Pushed to Bitbucket (simpaisa1/opmodel, DIG project) - [ ] CEO review and sign-off - [ ] Board presentation prepared and delivered

Pros: Establishes CDO credibility with the board on Day 30. Becomes the onboarding baseline for all future hires.
Cons: Time-intensive to finalise while other Phase 1 assessments run in parallel.
Value: Non-quantifiable but foundational - every subsequent initiative references this document.


1.2 Technology Assessment

Field Value
Priority P2
Owner CTO (Saqlain Raza)
Deadline 24 April 2026
Status Not started - dependent on CTO bandwidth

Key Results: - [ ] AWS account inventory (all accounts, services, spend by service line) - [ ] Data residency compliance assessed per market (PK, BD, NP, IQ, AE) - [ ] Cloudflare migration candidates identified - [ ] Monthly AWS spend confirmed - [ ] Single-region exposure flagged as risk

Pros: Provides the factual basis for Cloudflare migration and cost optimisation.
Cons: Requires DevOps team time; may reveal uncomfortable truths about infrastructure debt.
Cost: Internal effort only (~40 engineer-hours).
Value: Enables USD 200K+ annualised savings target (Phase 3).


1.3 Security Posture Review

Field Value
Priority P1
Owner CISO (Danish Hamid)
Deadline 27 April 2026
Status Threat models for 3 services completed. Full posture review pending.

Key Results: - [x] Threat models: Pay-Outs, Merchant Portal, Remittances - [ ] ISO 27001 scope confirmed for group structure (9 entities) - [ ] PCI DSS CDE boundaries documented - [ ] Pen test history reviewed (last test, critical findings, remediation status) - [ ] Gaps risk-rated (Critical/High/Medium/Low)

Pros: DFSA submission requires evidence of security posture. Early completion accelerates licence.
Cons: May reveal gaps that require immediate investment.
Value: Direct enabler for DFSA Cat 3D licence (revenue impact: entire UAE operations).

Industry context: 45% of financial organisations experienced AI-powered cyberattacks in 2025. Financial services is the most targeted industry. A single breach averages USD 5.9M in financial services. Proactive investment costs 10–20x less than breach remediation.


1.4 Product Audit

Field Value
Priority P2
Owner CPO (Rizwan Zafar)
Deadline 27 April 2026
Status Not started

Key Results: - [ ] Revenue and volume by product line and corridor documented - [ ] Product-market fit rated per corridor (Strong/Developing/Weak/Exit) - [ ] Roadmap reviewed against CDO strategic priorities - [ ] 3–5 product recommendations for Phase 2

Pros: Ensures capital is directed at highest-return corridors.
Cons: May create tension if CPO's roadmap diverges from CDO priorities.
Value: Revenue optimisation across 7 markets. Saudi corridor sizing.


1.5 Team Assessment

Field Value
Priority P2
Owner CDO
Deadline 24 April (1:1s) / 29 April (gap analysis)
Status Org chart v4.0 complete. 1:1s in progress.

Key Results: - [x] Org restructure designed (7 tribes, target 70) - [x] Role mappings defined for all 65 current staff - [ ] 1:1s completed with CPO, CISO, CTO and their directs - [ ] Capability gap analysis documented - [ ] Retention risks identified - [ ] CTO appointment preliminary view formed

Pros: Restructure already designed - execution is the remaining work.
Cons: Reapplication process will create anxiety. Must be handled with care.
Impact: 21 redeployments, 13 new hires, 1 resignation. Cultural reset.


1.6 Vendor Audit

Field Value
Priority P3
Owner CTO + Finance
Deadline 27 April 2026
Status Not started

Key Results: - [ ] All vendors catalogued with annual spend - [ ] Contract end dates and auto-renewal clauses documented - [ ] Lock-in risk rated (High/Medium/Low) - [ ] Renegotiation or termination candidates flagged

Pros: Quick wins on cost - typically 15–30% savings found on first audit.
Cons: Requires Finance cooperation and contract access.
Value: Estimated USD 50K–150K in immediate savings opportunities (Datadog alone estimated at USD 150K–200K/year).


1.7 DFSA Cat 3D Gap Remediation

Field Value
Priority P1
Owner CDO + CISO
Deadline 19 April 2026
Status Gap analysis exists. Remediation tracking not yet started.

Key Results: - [ ] All CDO-domain gaps reviewed and triaged - [ ] Each gap has named owner, remediation action, target date - [ ] No CDO-domain item on critical path without committed date - [ ] CISO confirms tech/security evidence pack is submission-ready

Pros: Directly unblocks the DFSA licence - the single most important regulatory milestone.
Cons: Compressed timeline (12 days remaining).
Value: DFSA licence enables UAE operations - estimated revenue impact USD 2M+ in Year 1.

Industry context: DFSA is becoming more demanding. AI governance frameworks and operational resilience are emerging requirements. Proactive investment now avoids costly remediation and accelerates approval.


1.8 Quick Wins

Field Value
Priority P3
Owner CDO
Deadline 14 April (identify) / 29 April (deliver)
Status Week 1 already delivered several visible outputs

Quick Wins Delivered (Week 1): 1. ✅ Operating Model v1.0 - most comprehensive group document ever produced 2. ✅ CDO Division Org Chart v4.0 - complete restructure with transition plan 3. ✅ 14 Ways of Work documents - governance framework from scratch 4. ✅ Bitbucket repo for OpModel - version control for governance docs 5. ✅ Confluence architecture space - standards, playbooks, threat models

Quick Wins Remaining (Week 2–4): 6. [ ] Terminate or renegotiate one over-priced vendor contract 7. [ ] Close one high-severity security finding 8. [ ] Establish first public-facing SLA commitment


1.9 Board Presentation: Operating Model v1.0

Field Value
Priority P1
Owner CDO
Deadline 29 April 2026
Status Content ready. Deck not yet built.

Key Results: - [ ] Board deck prepared (30–45 minutes + Q&A) - [ ] CEO pre-briefed - [ ] Board endorses operating model - [ ] Board approves Phase 2 investment outline

Pros: Establishes CDO as a board-level strategic voice from Day 30.
Cons: Board may challenge investment requests without financial modelling.
Value: Unlocks H2 2026 budget for Cloudflare, SRE, Data Engineering, Saudi expansion.


Phase 2: Restructure and Implement (Days 31–60)

Period: 30 April – 28 May 2026

2.1 Org Restructure Execution

Field Value
Priority P2
Owner CDO + HR
Deadline 28 May 2026
Status Designed. Not yet communicated.

Key Results: - [ ] Restructure communicated to all 65 staff - [ ] Reapplication process launched for changed roles - [ ] 13 new hire JDs published and recruitment initiated - [ ] Digital Office team operational (Arsalan, Wajih, Ahsan, Annus in new roles) - [ ] Head of Data Engineering search launched

Tribes established:

Tribe Head Headcount (Current → Target)
Solution Engineering CTO 27 → 27
Platform Engineering Muhammad Mohsin 9 → 9
Data Engineering Head of Data (hire) 2 → 6
Production Engineering Muhammad Owais Khalid 14 → 14
Information Security Danish Hamid (CISO) 9 → 9
Product Management Rizwan Zafar (CPO) 8 → 8
Digital Office CDO 4 → 9

Pros: Clear accountability. Modern engineering organisation. AI-native model.
Cons: Reapplication process will cause anxiety and potential attrition.
Impact: Expected natural attrition brings 77 (current + hires) down to target 70.
Cost: Recruitment costs for 13 hires estimated at USD 50K–80K (mix of direct and agency).


2.2 Cloudflare Migration: Phase 1 POC

Field Value
Priority P3
Owner CTO
Deadline 27 May 2026
Status Dependent on 1.2 (Technology Assessment)

Key Results: - [ ] Cloudflare enterprise account provisioned - [ ] One corridor POC deployed (Pakistan recommended) - [ ] Latency benchmarked: Cloudflare vs. AWS baseline - [ ] In-country data routing validated - [ ] Go/no-go recommendation presented

Pros: 40–60% reduction in per-transaction costs. Active-active DR capability. Edge routing for MENA expansion.
Cons: Engineering effort during restructure period. Risk of Workers limitations for complex payment logic.
Cost: USD 15K–25K (Cloudflare enterprise + engineering time).
Value: Enables USD 200K+ annual infrastructure savings at scale.


2.3 SRE Foundation

Field Value
Priority P2
Owner CTO
Deadline 14 May (SLOs) / 27 May (error budget)
Status Not started

Key Results: - [ ] SLOs defined for all critical services - [ ] Error budget policy published - [ ] CAB formally deprecated - [ ] On-call rotation established for at least one team

Pros: Reliability becomes measurable and enforceable. Board-level metric.
Cons: Cultural resistance to error budget enforcement. Test coverage may be too low.
Cost: Tooling USD 35K–65K/year (feature flags, PagerDuty). SRE hire USD 80K–120K.
Value: MTTR reduction, deployment frequency increase, customer-visible reliability improvement.


2.4 Daily Deploy Pipeline

Field Value
Priority P3
Owner CTO
Deadline 27 May 2026

Key Results: - [ ] One team deploying to production daily - [ ] Jenkins pipeline automated (unit tests, integration tests, Snyk scan) - [ ] Feature flags implemented - [ ] Automated rollback within 5 minutes

Pros: Engineering velocity. Faster time-to-market for Saudi corridors.
Cons: Requires test coverage audit first. Risk of increased incidents if coverage is low.
Cost: Internal effort (~60 engineer-hours). Feature flag tooling USD 20K–40K/year.
Value: Industry research shows only 25% of payment firms are modernising. This is competitive advantage.


2.5 OKR Rollout: Technology Teams Pilot

Field Value
Priority P3
Owner CDO
Deadline 27 May 2026

Key Results: - [ ] OKR framework defined - [ ] Q3 2026 OKRs agreed with CPO, CISO, CTO - [ ] OKRs cascaded to teams - [ ] Review cadence established - [ ] CEO briefed for wider rollout in Q4

Pros: Aligns all 70 people to measurable outcomes. Board-reportable.
Cons: OKR fatigue risk if not implemented with discipline.
Cost: Tooling USD 5K–15K/year. CDO time investment.
Value: Performance visibility. Accountability culture.


2.6 CTO Appointment Decision

Field Value
Priority P2
Owner CDO
Deadline 19 May 2026

Key Results: - [ ] CDO recommendation submitted to CEO - [ ] If appointment: scope, compensation, reporting confirmed - [ ] If external hire: JD drafted, search initiated - [ ] No ambiguity in CTO role beyond Day 60

Pros: Removes "Acting" uncertainty. Enables CTO to lead with authority.
Cons: External hire would take 3–6 months and create a leadership gap.


2.7 Product Roadmap Alignment

Field Value
Priority P2
Owner CDO + CPO
Deadline 27 May 2026

Key Results: - [ ] H2 2026 unified roadmap published - [ ] Saudi/MENA expansion technology requirements included - [ ] Cloudflare, SRE, active-active DR treated as first-class roadmap items - [ ] CPO and CDO aligned on prioritisation

Industry context: Cross-border payments market growing at 16% CAGR to USD 89B by 2030. ISO 20022 is consolidating as the foundational standard. Real-time payment rails are compressing settlement from days to seconds.


2.8 Security Improvements

Field Value
Priority P1
Owner CISO
Deadline 27 May 2026

Key Results: - [ ] All Critical findings in active remediation - [ ] 50% of High findings closed - [ ] Fortnightly status report to CDO


Phase 3: Measure and Optimise (Days 61–90)

Period: 29 May – 27 June 2026

3.1 KPI Baseline Establishment

Field Value
Priority P3
Owner CDO + CTO + CPO
Deadline 24 June 2026

Key Results: - [ ] 60 of 83 operating model KPIs have live baseline values - [ ] Data source and measurement method documented per KPI - [ ] KPI dashboard agreed with CEO and board

Value: Transforms the operating model from a document into a live management system.


3.2 Cost Optimisation

Field Value
Priority P3
Owner CTO + Finance
Deadline 19 June 2026

Key Results: - [ ] USD 200K annualised savings identified - [ ] USD 50K committed or in flight - [ ] AWS reserved instance / savings plan analysis completed - [ ] Datadog cost vs. alternative modelled

Industry context: Grafana Cloud typically 40–60% cheaper than Datadog. Self-hosted ELK saves 30–50% before headcount. Current Datadog estimated at USD 150K–200K/year.


3.3 Data Strategy

Field Value
Priority P2
Owner CDO + Head of Data Engineering (if hired)
Deadline 24 June 2026

Key Results: - [ ] Current state documented (MySQL, PostgreSQL, MongoDB, DocumentDB, Redis, Looker, Metabase) - [ ] Target state defined (cloud data warehouse, dbt, self-service BI) - [ ] Build vs. buy recommendation per component - [ ] Implementation roadmap aligned to DT Roadmap

Industry context: Fintech analytics market hitting USD 5.3B in 2026 (25% YoY growth). 81% of fintechs embed analytics as standard. Real-time processing is table stakes. Embedded analytics drive retention and upsell.


3.4 AI and ML Opportunities

Field Value
Priority P3
Owner CDO
Deadline 19 June (assessment) / 27 June (first initiative confirmed)

Key Results: - [ ] 3–5 AI/ML use cases identified, sized for effort and ROI - [ ] Reconciliation automation confirmed as Phase 1 priority - [ ] Phase 1 initiative has named lead, scope, start date - [ ] CEO and CPO briefed on AI/ML roadmap

Industry context: Industry is shifting from generative AI to agentic AI - autonomous systems that execute multi-step tasks. Frontier firms report 3x higher AI ROI. Top deployment: fraud detection (64%), loan processing (61%), customer onboarding (59%). AI automation can reduce operational headcount by 30–40% as you scale to new markets.


3.5 Saudi/MENA Talent Pipeline

Field Value
Priority P2
Owner CDO + HR
Deadline 24 June (plan) / 27 June (recruitment active)

Key Results: - [ ] Roles defined for Saudi launch - [ ] Location strategy confirmed - [ ] Compensation benchmarks produced - [ ] JDs published, recruiter engaged for at least 2 roles

Industry context: Saudi fintech market reached USD 39.9B in 2024, growing 13.7% CAGR to USD 125B by 2034. 224 licensed fintechs already - the window is open but filling fast. Saudi-South Asia remittance corridors align perfectly with Simpaisa's footprint.


3.6 Board Quarterly Report

Field Value
Priority P1
Owner CDO
Deadline 27 June 2026

Key Results: - [ ] Strategic progress vs. 90-day plan - [ ] KPI dashboard with actual values - [ ] Cost optimisation delivered and pipeline - [ ] Security posture improvement - [ ] H2 2026 investment requests with business cases


What We Will NOT Do in 90 Days

Out of Scope Reason
Full Cloudflare production migration POC first - production migration is H2 2026
Data warehouse implementation Strategy first (Phase 3), build in H2 2026
AI/ML production models Assessment and first initiative only
Central Asia market entry Saudi Arabia is the priority; Central Asia is 2027
Full observability platform replacement Assessment and POC only - migration is H2 2026
Complete headcount to 70 Hiring takes 3–6 months; target is 70 by end of 2026

Capital Ladder - Investment Phasing

Quarter Investment Purpose Expected Return
Q2 2026 (now) USD 50K–80K Recruitment (13 hires), tooling (feature flags, PagerDuty) Org restructure, reliability foundation
Q3 2026 USD 100K–150K Cloudflare enterprise, SRE tooling, observability POC, Head of Data salary Infrastructure modernisation, cost savings pipeline
Q4 2026 USD 150K–200K Cloudflare production, observability migration, data warehouse foundation USD 200K+ annualised savings, real-time analytics
H1 2027 USD 200K–300K Multi-market Cloudflare rollout, Saudi tech team, AI/ML production Saudi revenue, cross-corridor intelligence

Total Year 1 investment: USD 500K–730K
Expected Year 1 return: USD 200K+ cost savings + DFSA licence revenue (USD 2M+) + Saudi corridor revenue (TBD)
Payback: < 12 months on cost savings alone; < 6 months including DFSA revenue



Part B: Digital Office - 30/60/90 Day Plan

What is the Digital Office?

The Digital Office is the CDO's strategic execution arm. It sits between strategy and delivery - validating opportunities upstream of SDLC, owning delivery methodology, running spikes and PoCs, and managing developer experience. It does NOT do day-to-day engineering or product management. It does the thinking that those teams then execute.

Team (Current):

Name Role Background
Arsalan Pervez Manager Digital Delivery was: PMO Manager
Wajih Aslam Digital Coach was: Agile Coach
Muhammad Ahsan Associate Delivery Analyst was: Project Coordinator
Annus Ahmed Associate Delivery Analyst was: Project Coordinator

Hires Planned (5):

Role Purpose
Principal Digital Architect Solution design, feasibility, technical prototyping, PoC architecture
Digital Product Strategist Market research, concept validation, business case, opportunity sizing
Principal Digital Engineer Developer experience - internal portals, golden paths, CLI tooling
Senior Digital Engineer Rapid PoCs, technical spikes, API exploration, data modelling
Senior Digital Engineer Rapid PoCs, technical spikes, API exploration, data modelling

Target headcount: 9 (4 current + 5 hires)


Digital Office Mission

Validate opportunities upstream of SDLC. Produce validated concepts with architecture blueprints for handoff to Product and Engineering. Kill bad ideas fast. Run spikes and Sprint 0 activities. Own the delivery methodology and developer experience.


Phase 1: Establish and Assess (Days 1–30)

Period: 7 April – 6 May 2026

DO-1.1 Team Onboarding and Role Clarity

Field Value
Priority P2
Owner CDO
Deadline 14 April 2026

Key Results: - [ ] 1:1s with all 4 team members - explain new roles, expectations, career path - [ ] Digital Office charter document published (mission, scope, what we do / don't do) - [ ] Reporting lines and operating cadence established - [ ] Each team member has a 30-day personal development objective

Pros: Sets the tone. People moving from PMO/coordination roles need clarity on the strategic shift.
Cons: Team members may feel anxious about capability gap (PMO → Digital Office is a stretch).
Mitigation: Pair each person with a mentor from Engineering or Product for the first 30 days.


DO-1.2 Delivery Methodology Ownership

Field Value
Priority P2
Owner Manager Digital Delivery (Arsalan Pervez)
Deadline 21 April 2026

Key Results: - [ ] Review all 14 Ways of Work documents and identify gaps or inconsistencies - [ ] Establish the Digital Office as the owner of delivery methodology across the CDO division - [ ] Create a delivery health dashboard (cycle time, WIP, throughput per team) - [ ] Run the first cross-team delivery standup (CDO Division Standup per W-01)

Pros: Arsalan's PMO background is directly relevant - this is a natural extension, not a stretch.
Cons: Risk of becoming a "governance police" rather than enabling function. Must be positioned as service, not oversight.
Value: Visibility into delivery health across 7 tribes. Early warning on blockers.


DO-1.3 Current State Process Audit

Field Value
Priority P3
Owner Digital Coach (Wajih Aslam)
Deadline 28 April 2026

Key Results: - [ ] Observe every Kanban team's standup and planning session (at least once each) - [ ] Document: actual vs. prescribed process (W-10) for each team - [ ] Identify top 3 process pain points per team - [ ] Produce a "State of Delivery" report for the CDO

Pros: Wajih's agile coaching background is perfect for this. Builds trust by listening first.
Cons: Teams may see observation as surveillance. Frame as "how can we help you" not "what are you doing wrong."
Value: Evidence-based view of where delivery methodology is working and where it isn't.


DO-1.4 Tool Standards Baseline

Field Value
Priority P3
Owner Associate Delivery Analysts (Ahsan + Annus)
Deadline 28 April 2026

Key Results: - [ ] Audit all tools in use across CDO division (Jira, Confluence, Bitbucket, Slack, etc.) - [ ] Map actual usage against W-03 (Tool Standards) - [ ] Identify tool sprawl, unused licences, and consolidation opportunities - [ ] Produce a tool register with cost, owner, and contract status

Pros: Concrete, measurable task. Good onboarding project for associates.
Cons: Low strategic value in isolation - but feeds vendor audit (1.6) and cost optimisation (3.2).
Value: Typically finds 10–20% in unused licence costs.


DO-1.5 Hire: Principal Digital Architect

Field Value
Priority P2
Owner CDO + HR
Deadline JD published by 14 April. Interview pipeline active by 28 April.

Key Results: - [ ] JD published on LinkedIn, Bitbucket Talent, and regional job boards - [ ] Recruiter engaged (internal or agency) - [ ] First round interviews by end of Phase 1

Rationale: This is the most critical Digital Office hire. The Digital Architect owns solution design, feasibility, and PoC architecture - without this person, the team cannot do its core job.


Phase 2: Build Capability and Prove Value (Days 31–60)

Period: 7 May – 5 June 2026

DO-2.1 First Spike: Saudi Arabia Technology Readiness

Field Value
Priority P2
Owner Digital Office (CDO sponsors)
Deadline 21 May 2026

Key Results: - [ ] Technology requirements for SAMA licensing documented - [ ] Data residency requirements for Saudi Arabia mapped - [ ] Integration requirements for Saudi payment rails identified (SARIE, mada, STC Pay) - [ ] Architecture blueprint for Saudi corridor produced - [ ] Go/no-go readiness assessment presented to CDO

Pros: Proves the Digital Office model - upstream validation before Engineering builds anything.
Cons: Requires domain expertise the team may not yet have. May need external consultant input.
Value: De-risks the single highest-priority expansion market. Prevents Engineering from building the wrong thing.

Industry context: Saudi fintech market growing 13.7% CAGR to USD 125B by 2034. 70% non-cash transactions already achieved. Window is open but 224 fintechs already licensed.


DO-2.2 Developer Experience Assessment

Field Value
Priority P3
Owner Digital Office
Deadline 28 May 2026

Key Results: - [ ] Time-to-first-commit measured for new engineers (current state) - [ ] Developer satisfaction survey conducted across all engineering teams - [ ] Top 5 developer experience pain points identified - [ ] Golden paths defined for common development tasks - [ ] Internal developer portal requirements documented

Pros: Directly improves engineering velocity. Measurable impact.
Cons: Requires the Principal Digital Engineer hire (may not be in place yet).
Mitigation: Start with the assessment; build the solutions when the hire arrives.
Value: Industry research shows developer experience improvements drive 20–40% productivity gains.


DO-2.3 Delivery Methodology Rollout

Field Value
Priority P3
Owner Digital Coach (Wajih Aslam) + Manager Digital Delivery (Arsalan)
Deadline 5 June 2026

Key Results: - [ ] 10-day delivery cycle formally adopted by all 4 engineering squads (Pay-Ins, Pay-Outs, Portals, Remittance) - [ ] Kanban boards standardised per W-10 - [ ] WIP limits enforced - [ ] Day 10 retro/demo/groom running consistently - [ ] Delivery metrics being captured (cycle time, throughput, WIP age)

Pros: Transforms paper process (W-10) into actual practice.
Cons: Teams may resist change. "We already do agile" pushback likely.
Mitigation: Frame as "we're helping you do what the document says" not "we're changing how you work."


DO-2.4 Architecture Review Board Operations

Field Value
Priority P3
Owner CDO (chairs) + Digital Office (secretariat)
Deadline First ARB by 5 May (per W-01: 1st Tuesday monthly)

Key Results: - [ ] First ARB meeting held - [ ] ADR template published and adopted - [ ] First 3 ADRs drafted (Cloudflare, observability, data warehouse) - [ ] Standards exception process documented - [ ] ARB cadence running monthly

Pros: Establishes architectural governance without bureaucracy.
Cons: Risk of becoming a bottleneck if not run with pace.


DO-2.5 Continue Hiring

Field Value
Priority P2
Owner CDO + HR
Deadline Ongoing

Key Results: - [ ] Principal Digital Architect: offer extended or second round in progress - [ ] Digital Product Strategist: JD published, pipeline active - [ ] Principal Digital Engineer: JD published, pipeline active - [ ] Senior Digital Engineers (x2): JDs published


Phase 3: Scale and Embed (Days 61–90)

Period: 6 June – 5 July 2026

DO-3.1 Spike: AI-Assisted Reconciliation

Field Value
Priority P3
Owner Digital Office
Deadline 26 June 2026

Key Results: - [ ] Current reconciliation process documented (manual effort, error rate, time per market) - [ ] AI reconciliation POC scoped with Data Engineering - [ ] Feasibility assessment: data availability, model approach, expected accuracy - [ ] Business case produced (hours saved × cost per hour × markets) - [ ] Handoff to Data Engineering and Solution Engineering for implementation

Pros: Highest-ROI AI use case identified in CDO 90-Day Plan. Digital Office validates; Engineering builds.
Cons: Requires Data Engineering team to exist (Head of Data may not be hired yet).
Value: Reconciliation is manual across 7 markets. Automation could save 500+ hours/month at scale.


DO-3.2 Spike: ISO 20022 Readiness Assessment

Field Value
Priority P2
Owner Digital Office
Deadline 3 July 2026

Key Results: - [ ] Current message format compliance assessed per corridor - [ ] ISO 20022 gap analysis produced - [ ] Migration roadmap drafted - [ ] Regulatory deadline per jurisdiction documented

Industry context: ISO 20022 is consolidating as the foundational standard for cross-border payments. Enables richer data for analytics and compliance. Non-compliance will lock Simpaisa out of emerging real-time payment links.


DO-3.3 Delivery Health Report: Month 3

Field Value
Priority P3
Owner Manager Digital Delivery (Arsalan)
Deadline 5 July 2026

Key Results: - [ ] Delivery metrics dashboard live (cycle time, throughput, WIP, deployment frequency per team) - [ ] Month-over-month trend analysis - [ ] Recommendations for CDO on capacity allocation - [ ] Input to CDO Board Quarterly Report (3.6)


DO-3.4 Digital Office OKRs for Q3 2026

Field Value
Priority P3
Owner CDO
Deadline 5 July 2026

Key Results: - [ ] Digital Office Q3 OKRs published (aligned to CDO OKRs) - [ ] Each team member has individual OKRs - [ ] First OKR check-in completed

Suggested Q3 OKRs:

Objective 1: Validate 3 strategic opportunities upstream of SDLC - KR1: Complete Saudi Arabia technology readiness spike with architecture blueprint - KR2: Complete AI reconciliation feasibility spike with business case - KR3: Complete ISO 20022 readiness assessment with migration roadmap

Objective 2: Improve engineering delivery velocity by 20% - KR1: All 4 engineering squads running standardised 10-day cycles with metrics - KR2: Average cycle time reduced by 20% from Phase 1 baseline - KR3: Developer experience score improved by 15% from baseline survey

Objective 3: Hire 3 of 5 planned Digital Office roles - KR1: Principal Digital Architect hired and onboarded - KR2: Digital Product Strategist hired - KR3: At least 1 Senior Digital Engineer hired


Digital Office - What We Will NOT Do

Out of Scope Why
Write production code That's Solution Engineering's job. We validate and hand off.
Own the product backlog That's Product Management's job. We run spikes that inform the backlog.
Manage people in other tribes We coach and enable, not manage. No dotted-line reporting.
Run programme management We killed the PMO. We don't replace it. We enable self-organising teams.
Own compliance or regulatory That's Information Security and Regulatory Affairs. We support with tech assessments.

Summary: Digital Office Value Proposition

Month Deliverables Business Value
Month 1 Team onboarded, delivery methodology owned, process audit, tool audit, first hire in pipeline Governance foundation, delivery visibility
Month 2 Saudi readiness spike, DX assessment, delivery methodology live, ARB operational Saudi expansion de-risked, engineering velocity baseline
Month 3 AI reconciliation spike, ISO 20022 assessment, delivery health metrics, Q3 OKRs Two validated business cases, measurable delivery improvement

90-day cost: USD 0 incremental (team is redeployed from existing headcount) + USD 30K–50K recruitment costs for first 1–2 hires
90-day value: Saudi expansion de-risked (USD multi-million revenue opportunity), AI reconciliation business case (500+ hours/month savings potential), delivery velocity baseline (enables continuous improvement)


Document version 2.0. Review at Day 30, Day 60, and Day 90. Living document - update as conditions change.